Hardware Install & Configuration.

Tagging, labeling, reader setup, infrastructure tuning. The field-ops phase where the design becomes physical — cable runs, mounted readers, applied tags, tested-on-Friday handoff.

Built for Successful Deployment

Every implementation is tailored to your operational requirements. ARK manages tagging and labeling, RFID reader configuration, and infrastructure setup to ensure your asset tracking solution is deployed for reliable, long-term performance.

Every deployment is tailored to your environment, operational requirements, and implementation goals. ARK manages the installation process from start to finish, providing the expertise, equipment, and support needed for a successful rollout.

Asset tag
Cable routeRackPower
Phase 01

Site prep and staging.

Pre-built rack assemblies, tested reader firmware, and pre-applied tags on your asset list — shipped to site ready to install, not ready to unbox. We coordinate with your facilities team on cable routes and power before we arrive.

  • Cable route coordination
  • Rack pre-assembly and test
  • Tag pre-application
  • Power and network readiness check
ReaderAntennaPower
Phase 02

Reader mounting and cabling.

Our field crew handles reader mounting, cable runs, antenna positioning, and power connections. We bring our own tools, lifts, and materials — no waiting on your facilities team to find a ladder.

  • Reader mounting at spec positions
  • Antenna positioning and cabling
  • Power and network terminations
  • Cable management and labeling
Firmware
Zone
LLRP
Read-rate ✓ Acceptance
Phase 03

Configuration and handoff.

Reader firmware, zone configuration, LLRP profiles, and end-to-end read-rate verification — tested across shifts and asset types before we hand over the keys. You get a read-rate report and a signed acceptance doc.

  • Firmware and zone configuration
  • LLRP and EPC profile setup
  • Read-rate verification by zone
  • Signed acceptance documentation

Deliverables.

Deliverable 01

Installation report

As-built diagram, cable schedules, reader serial numbers, and firmware versions.

Deliverable 02

Read-rate verification report

Zone-by-zone read-rate results across multiple asset types and shift conditions.

Deliverable 03

Acceptance sign-off

Documented acceptance criteria, test results, and handoff to operations.