Case study · Construction

[Client name] cut tool shrinkage by [metric]%

[Short summary of the engagement — problem, intervention, outcome. One paragraph naming the metric and the operational change behind it.]

At a glance.

Industry

Construction

Multi-site general contractor

Product used

Grey Trunk RFID

Mobile + Bluetooth sled

Engagement length

11 weeks

Scope → pilot → deploy

Headline outcome

[N]% shrinkage cut

Measured at 90-day mark

The problem.

[What the client was doing before: manual check-outs on paper, shrinkage rate, time spent on weekly tool counts.]

What we built.

[What ARK built: Grey Trunk RFID with Bluetooth handhelds, crib check-in/out workflow, shrinkage reporting dashboard.]

The outcome.

[Measured result: shrinkage reduced by [metric]%, weekly tool count time dropped from [N] hours to [N] minutes.]

More case studies.

See all case studies →

Tell us about your floor.

A thirty-minute call with a solutions architect. We'll walk your operation, look at your assets, and tell you whether the result on this page is realistic for you.