[Short summary of the engagement — problem, intervention, outcome. One paragraph naming the metric and the operational change behind it.]
Construction
Multi-site general contractor
Grey Trunk RFID
Mobile + Bluetooth sled
11 weeks
Scope → pilot → deploy
[N]% shrinkage cut
Measured at 90-day mark
[What the client was doing before: manual check-outs on paper, shrinkage rate, time spent on weekly tool counts.]
[What ARK built: Grey Trunk RFID with Bluetooth handhelds, crib check-in/out workflow, shrinkage reporting dashboard.]
[Measured result: shrinkage reduced by [metric]%, weekly tool count time dropped from [N] hours to [N] minutes.]
A thirty-minute call with a solutions architect. We'll walk your operation, look at your assets, and tell you whether the result on this page is realistic for you.